World Scientific
Skip main navigation

Cookies Notification

We use cookies on this site to enhance your user experience. By continuing to browse the site, you consent to the use of our cookies. Learn More
×

System Upgrade on Tue, May 28th, 2024 at 2am (EDT)

Existing users will be able to log into the site and access content. However, E-commerce and registration of new users may not be available for up to 12 hours.
For online purchase, please visit us again. Contact us at customercare@wspc.com for any enquiries.

4D-VAR: OPTIMISATION AND PERFORMANCE ON THE NEC SX-6

    https://doi.org/10.1142/9789812701831_0011Cited by:0 (Source: Crossref)
    Abstract:

    The Met Office 4D-Var scheme went operational in October 2004. In order to produce a timely analysis, 6 nodes are used compared to the 1 node that was previously required for 3D-Var. Even with this 6 fold increase in resources, 4D-Var takes 4 times longer to complete: Optimising 4D-Var for the SX-6 has been, and continues to be, a high priority. Porting the code from the Cray T3Es is described, along with optimisations introduced to October 2004, such as techniques for increasing vector lengths and reducing communication overheads. Impacts of optimisations are presented, along with investigations into the scalability of the code on a per routine basis.