World Scientific
Skip main navigation

Cookies Notification

We use cookies on this site to enhance your user experience. By continuing to browse the site, you consent to the use of our cookies. Learn More
×

System Upgrade on Tue, May 28th, 2024 at 2am (EDT)

Existing users will be able to log into the site and access content. However, E-commerce and registration of new users may not be available for up to 12 hours.
For online purchase, please visit us again. Contact us at customercare@wspc.com for any enquiries.

WBAT Job Scheduler: A Multi-Objective Approach for Job Scheduling Problem on Cloud Computing

    https://doi.org/10.1142/S0218126620500899Cited by:13 (Source: Crossref)

    The main objective of the proposed methodology is multi-objective job scheduling using hybridization of whale and BAT optimization algorithm (WBAT) which is used to change existing solution and to adopt a new good solution based on the objective function. The scheduling function in the proposed job scheduling strategy first creates a set of jobs and cloud node to generate the population by assigning jobs to cloud node randomly and evaluate the fitness function which minimizes the makespan and maximizes the quality of jobs. Second, the function uses iterations to regenerate populations based on WBAT behavior to produce the best job schedule that gives minimum makespan and good quality of jobs. The experimental results show that the performance of the proposed methods is better than the other methods of job scheduling problems.

    This paper was recommended by Regional Editor Tongquan Wei.