World Scientific
Skip main navigation

Cookies Notification

We use cookies on this site to enhance your user experience. By continuing to browse the site, you consent to the use of our cookies. Learn More
×

System Upgrade on Tue, May 28th, 2024 at 2am (EDT)

Existing users will be able to log into the site and access content. However, E-commerce and registration of new users may not be available for up to 12 hours.
For online purchase, please visit us again. Contact us at customercare@wspc.com for any enquiries.

AN ADVANCE RESERVATION-BASED COMPUTATION RESOURCE MANAGER FOR GLOBAL SCHEDULING

    https://doi.org/10.1142/9789812708823_0001Cited by:1 (Source: Crossref)
    Abstract:

    Advance Reservation is one possible way to enable resource co-allocation on the Grid. This method requires all the resources to have advance reservation capability as well as coordination protocol support. We employed two-phase commit protocol as a coordination protocol, which is common in the distributed transaction area, and implemented an Advance Reservation Manager called PluS. PluS works with existing local queuing managers, such as TORQUE or Grid Engine, and provides users advance reservation capability. To provide the capability, there are two implementation methods; 1) completely replaces the scheduling module of the queuing manger, 2) represents reservation as a queue and controls the queues using external interface. We designed and implemented a reservation manager with both way, and evaluated them. We found that the former has smaller overhead and allows arbitrary scheduling policy, while the latter is much easier to implement with acceptable response time.