IT IN SUPPLY CHAIN MANAGEMENT: BATAMINDO SHIPPING & WAREHOUSE PTE LTD
The following sections are included:
BACKGROUND
OPERATIONS WORKFLOW
IT AS AN ENABLER
Phase 1: The Beginning — Data Capture with DOS (1990–1999)
Phase 2: The Evolution — Proprietary In-House IT System (1999–2007)
Phase 3: The Enhancements (2007–2011)
USER ACCESS AND CONTROL
CONSIDERATIONS AND CHALLENGES FACED
CONCLUSION (2010 AND BEYOND)