Chapter 14: Status of Development and Demonstration of SFCLs in Korea
In Korea, a 22.9 kV SFCL was developed and demonstrated in Icheon Substation. The operation had been very stable. In parallel, a 154 kV single-phase SFCL was developed and has been under field tests.