World Scientific
Skip main navigation

Cookies Notification

We use cookies on this site to enhance your user experience. By continuing to browse the site, you consent to the use of our cookies. Learn More
×
Spring Sale: Get 35% off with a min. purchase of 2 titles. Use code SPRING35. Valid till 31st Mar 2025.

System Upgrade on Tue, May 28th, 2024 at 2am (EDT)

Existing users will be able to log into the site and access content. However, E-commerce and registration of new users may not be available for up to 12 hours.
For online purchase, please visit us again. Contact us at customercare@wspc.com for any enquiries.

Chapter 3.6: AC Cable: Yokohama Project

    https://doi.org/10.1142/9789814749268_0020Cited by:0 (Source: Crossref)
    Abstract:

    High Temperature Superconducting (HTS) cables can transmit large amounts of electricity in a compact size with minimal losses. Therefore, they are expected to save the construction cost of underground lines in urban areas and decrease transmission losses. Several HTS cables have recently been demonstrated in networks around the world, and full-scale commercialization is expected in the near future. In Japan, the development of compact HTS cables suitable for urban deployment has been underway since the early 1990s. In 2007, a national project was started to verify their operational performance and long-term reliability in the grid. An HTS cable 240 m long was installed at the Asahi substation of the Tokyo Electric Power Company (TEPCO) in Yokohama; then a joint, terminations and cooling system was constructed in 2011. After successful performance tests, the cable was connected to the grid for the first time in Japan, and started to deliver electricity to 70,000 households in October 2012. This trouble-free in-grid service continued for over a year. We can conclude that the HTS cable system performs well and has the stability required for long-term in-grid operations.