World Scientific
Skip main navigation

Cookies Notification

We use cookies on this site to enhance your user experience. By continuing to browse the site, you consent to the use of our cookies. Learn More
×
Spring Sale: Get 35% off with a min. purchase of 2 titles. Use code SPRING35. Valid till 31st Mar 2025.

System Upgrade on Tue, May 28th, 2024 at 2am (EDT)

Existing users will be able to log into the site and access content. However, E-commerce and registration of new users may not be available for up to 12 hours.
For online purchase, please visit us again. Contact us at customercare@wspc.com for any enquiries.

Chapter 3.5: AmpaCity Project — World's First Superconducting Cable and Fault Current Limiter Installation in a German City Center

    https://doi.org/10.1142/9789814749268_0019Cited by:1 (Source: Crossref)
    Abstract:

    This chapter will give an overview on the German AmpaCity project, which started in September 2011. The objective of the project is developing, manufacturing and installing a 10 kV, 40MVA HTS system consisting of a fault current limiter and of a 1 km cable in the city of Essen. It is the first time that a one kilometer HTS cable system is installed together with an HTS fault current limiter in a real grid application. In addition, it is the longest installed HTS cable system worldwide. Within the project the development phase was finished in March 2013 with successfully completing the type test of the cable system. Subsequently, all system components were manufactured for the installation on site in Essen. The installation took less than three months finishing at the end of November 2013. Afterwards, the commissioning test of the system was performed in December and the system was finally commissioned beginning of 2014.